Progress on Featured Project (Part 2)

Here we are, the second update of our featured project that is in progress as we speak. (well, when it isn’t raining it is in progress). The accessible bath addition is coming along as scheduled and we are excited to show you some of the progress as well as tease you a little with a peak at the material selections that were made for the new bathroom.

First, let’s take a look at the footings, foundation and framing. I know this isn’t the most exciting part for most people, but we would probably all agree that they are an important part of this project. This home addition measures 10’ x 10’ and requires all the prep that would have been done if it was originally part of the home. Footings, foundation, framing and then on to the roofing, masonry work, and gutters before we even start on the inside.

Long before the above work even started, our homeowner was working through the planning, designing and material selections with Kevin King, one of the Designers here at DreamMaker. It typically takes several appointments to get through the entire selection and decision making processt but honestly, once this is done and the final contract is signed, the homeowner gets to relax a bit and enjoy watching the action take place. This ensures that materials are ordered, received here in our warehouse, and ready to go rather than waiting once we get busy in your home.

So what are we going to see in 2-3 weeks? I’ll give you one picture and a few descriptive names…can you place the name with the correct item?

Prairie Beige Soft Cream with Walnut Glaze Driftwood Mascarpone

bathroom finishes selections